|
DEPARTMENT: Transportation - Highway Negligence Litigation |
|||||
| FORM 1: JUDGMENTS PAID BY THE STATE | |||||
| NAME OF CASE | AMOUNT PAID | INTEREST | FUNDING SOURCE | LOCATION | SUMMARY
OF CASE |
| Auvenshine v MDOT | $1,331,973.89 | $543,023.89 | State Trunkline Fund | Eaton | Improper design, signing and warnings for Y intersection. |
| FY 1996-97 TOTAL: | $ 1,331,973.89 | $543,023.89 | |||
|
DEPARTMENT: Transportation - Highway Negligence Litigation |
|||||
| FORM 2: SETTLEMENTS PAID BY THE STATE | |||||
| NAME OF CASE | AMOUNT PAID | INTEREST | FUNDING
SOURCE |
LOCATION | SUMMARY
OF CASE |
| Alwan v MDOT | $15,000.00 | $0 | State Trunkline Fund | Wayne | Failure to maintain highway, water allowed to accumulate on highway and failure to post danger warning signs. |
| Bednard v MDOT | 800,000.00 | 0 | State Trunkline Fund | Wayne | Improper freeway ramp design, lack of advisory speed signs, lack of guardrails and curbing, failure to warn regarding curve. |
| Belyea v MDOT | 2,100,000.00 | 0 | State Trunkline Fund | St. Clair | Failure to warn and sign for special hazard. Failure to maintain for snow and ice. |
| Brewer v MDOT | 20,000.00 | 0 | State Trunkline Fund | Shiawassee | Lack of traffic signal at intersection. |
| Brockway v MDOT | 50,000.00 | 0 | State Trunkline Fund | Shiawassee | Failure to warn for water accumulation due to improper drainage. |
| Brown v MDOT | 85,000.00 | 0 | State Trunkline Fund | Oakland | Improper signing and traffic signalization. |
| Campbell v MDOT | 90,000.00 | 0 | State Trunkline Fund | Wayne | Failure to warn for sight obstruction. |
| Crutcher v MDOT | 3,000.00 | 0 | State Trunkline Fund | Wayne | Failure to maintain highway surface. |
| Dempsey v MDOT | 185,000.00 | 0 | State Trunkline Fund | Oakland | Grade differential, improper cross-over design, lack of "right turn only" signs, median "do not enter" sequence; improper speed limit. |
| Edwards v MDOT | 25,000.00 | 0 | State Trunkline Fund | Shiawassee | Failure to warn, sign, and signal regarding hazardous condition at intersection. |
| Gardner v MDOT | 250,000.00 | 0 | State Trunkline Fund | Ottawa | Failure to adequately design ramp intersection, lack of clear vision, traffic control devices, warning, proper merger. |
| Geers v MDOT | 15,000.00 | 0 | State Trunkline Fund | Newaygo | Lack of proper traffic signal device and warning signs, lack proper design and speed limit. |
| Gothier v MDOT | 3,750.00 | 0 | State Trunkline Fund | Wayne | Dangerous maintenance by snow blading of water buildup. |
| Greer v MDOT | 22,500.00 | 0 | State Trunkline Fund | Wayne | Failure to warn for pothole. |
| Hamilton v MDOT | 10,000.00 | 0 | State Trunkline Fund | Wayne | Improper exit ramp barriers and speed limits. |
| Hands v MDOT | 100,000.00 | 0 | State Trunkline Fund | Jackson | Lack of sign distance, night illumination, traffic control devices, reduced speed, stop bars, overpass, turn-out lanes. |
| Hogan v MDOT | 15,000.00 | 0 | State Trunkline Fund | Genesee | Improper design, drainage, excessive speed limits, improper slope, failure to maintain unnatural accumulation of snow and ice. |
| Kapuscik v MDOT | 225,000.00 | 0 | State Trunkline Fund | Shiawassee | Rutting resulting in water accumulation and hydroplaning. |
| Karadimos v MDOT | 650,000.00 | 0 | State Trunkline Fund | Oakland | Lack of signal, warning devices at exit ramp intersection. |
| Keindl v MDOT | 10,000.00 | 0 | State Trunkline Fund | Roscommon | Failure to warn and maintain regarding preferential icing on bridge. |
| Klopf v MDOT | 5,000.00 | 0 | State Trunkline Fund | Montcalm | Failure to sign at known point of hazard. |
| Landry v MDOT | 85,000.00 | 0 | State Trunkline Fund | Sanilac | Failure to maintain roadway; improper grade design due to shoulder drop. |
| Lecik v MDOT | 7,500.00 | 0 | State Trunkline Fund | Macomb | Failure to warn for and regulate traffic during inspection of bridge overpasses. |
| Lopez v MDOT | 11,000.00 | 0 | State Trunkline Fund | Wayne | Improper barriers and speed limit. |
| Lovell v MDOT | 40,000.00 | 0 | State Trunkline Fund | Wayne | Improper design of freeway ramp regarding superelevation. Failure to warn for and maintain regarding snow and ice. |
| Machuta v MDOT | 75,000.00 | 0 | State Trunkline Fund | Isabella | Lack of proper traffic control devices and signs. Inadequate sight distance. |
| Mantei v MDOT | 396,598.56 | 1,598.56 | State Trunkline Fund | Genesee | Improper design including multiple driveways near intersection; curved roadway near intersection; improper sight distance and inadequate traffic control device. |
| Mapes v MDOT | 80,000.00 | 0 | State Trunkline Fund | Midland | Failure to maintain. |
| Morreale v MDOT | 14,000.00 | 0 | State Trunkline Fund | Roscommon | Lack of proper warning signs and improper intersection design. |
| Nathaniel v MDOT | 3,000.00 | 0 | State Trunkline Fund | Oakland | Failure to maintain due to flooding and failure to warn of defect. |
| Neusbaum v MDOT | 225,000.00 | 0 | State Trunkline Fund | Kalamazoo | Defective design of median and approaches; lack of traffic control devices, excessive speed limit, lack of prohibition of U-turn and lack of left-turn lane. |
| Parmele v MDOT | 75,000.00 | 0 | State Trunkline Fund | Wayne | Failure to warn for ruts and potholes. |
| Potter v MDOT | 50,000.00 | 0 | State Trunkline Fund | Jackson | Failure to warn of obstruction on highway; insufficient bridge height, improper postings of height. |
| Robinson v MDOT | 362,500.00 | 0 | State Trunkline Fund | Shiawassee | Unnatural accumulation of water. |
| Rogers v MDOT | 625,000.00 | 0 | State Trunkline Fund | Wayne | Failure to design and maintain overpass properly due to falling concrete chunks. |
| Rupe & Jones v MDOT | 800,000.00 | 0 | State Trunkline Fund | Oakland | Too narrow freeway median, lack of median barrier; drop off between roadbed and shoulder. |
| Seymour v MDOT | 700,000.00 | 0 | State Trunkline Fund | Bay | Nonfunctioning traffic signal; lack of shield on signal; improper configuration. |
| Shannon v MDOT | 5,000.00 | 0 | State Trunkline Fund | Wayne | Improper exit ramp barriers and speed limits. |
| Slone v MDOT | 3,500.00 | 0 | State Trunkline Fund | Macomb | Failure to maintain traffic control device. |
| Strickland v MDOT | 50,000.00 | 0 | State Trunkline Fund | Montcalm | Lack of passing sight distance; failure to properly mark no passing zone. |
| Thompson v MDOT | 595,000.00 | 0 | State Trunkline Fund | Washtenaw | Unsafe curve in expressway ramp, lack of warning for merger on curve; improper merge design. |
| Vang v MDOT | 1,503.10 | 0 | State Trunkline Fund | Macomb | Water flooding over highway. |
| Walker v MDOT | 5,000.00 | 0 | State Trunkline Fund | Wayne | Failure to maintain and warn regarding pothole or uncovered manhole. |
| Washington v MDOT | 2,500.00 | 0 | State Trunkline Fund | Wayne | Failure to repair, warn, barricade regarding pothole. |
| Wilmers v MDOT | 3,500.00 | 0 | State Trunkline Fund | Clare | Failure to maintain due to pothole. |
| Wyrobeck v MDOT | 90,000.00 | 0 | State Trunkline Fund | Monroe | Water accumulation without adequate provision for removal or warning. |
| Young, Debra v MDOT | 275,000.00 | 0 | State Trunkline Fund | Mackinac | Lack of warning and/or rerouting for traffic due to water accumulation. |
| Young, Steven v MDOT | 45,000.00 | 0 | State Trunkline Fund | Mackinac | Lack of warning and/or rerouting for traffic due to water accumulation. |
| Zimmer v MDOT | 375,000.00 | 0 | State Trunkline Fund | Ottawa | Lack of indirect left turn lane, leading left turn phase, and improper speed. |
| FY 1996-97 TOTAL: | $ 9,679,851.66 | 1,598.56 | |||